Notes and information on our own personal Solar Installation

Reasonable price: $3.50 - $4.00 a Watt

 

Using these prices a 16 Panel, 250 Watt per panel system would equal 4 kW, about $16,000.

 

A 4 KW system would produce 525 – 575 KWH a month.

 

Power optimizer systems: start producing electricity and send it to your home to be used as soon as the sun touches the first panel.

Micro-Inverter systems:  If you have 250 W panels then you need at least 250 W of sun touching the panel for it to convert the energy to electricity and send it to you home.

 

You have to call your electric company for the net-metering contract before you install the panels. Once installation is finished you mail or drop off the original, signed and filled out 5 page document (for CECC). Once your electric company receives it they will call you to set up an appointment to come and inspect the system and Auto Disconnect.

 

Install Steps and supplies for Power Optimizer System:

 

  1. Brackets

  2. Railings

  3. Power Optimizers

  4. Solar Panels

  5. 1” AC cord to Inverter

  6. Inverter

 

  • Automatic Shut-Off box

  • Inverter cord to electric braker box

  • Wireless transmitter

  • Wireless receiver

Lean Power, Solar and Wind Distributed Energy in NWA and the Ozarks, No Transmission Lines, No Power Lines, Lean Power, Solar and Wind Distributed Energy in NWA and the Ozarks, No Transmission Lines, No Power Lines

, Lean Power, Solar and Wind Distributed Energy in NWA and the Ozarks, No Transmission Lines, No Power Lines

, Lean Power, Solar and Wind Distributed Energy in NWA and the Ozarks, No Transmission Lines, No Power Lines

Lean Power, Solar and Wind Distributed Energy in NWA and the Ozarks, No Transmission Lines, No Power Lines, Lean Power, Solar and Wind Distributed Energy in NWA and the Ozarks, No Transmission Lines, No Power Lines

, Lean Power, Solar and Wind Distributed Energy in NWA and the Ozarks, No Transmission Lines, No Power Lines

, Lean Power, Solar and Wind Distributed Energy in NWA and the Ozarks, No Transmission Lines, No Power Lines

Lean Power, Solar and Wind Distributed Energy in NWA and the Ozarks, No Transmission Lines, No Power Lines, Lean Power, Solar and Wind Distributed Energy in NWA and the Ozarks, No Transmission Lines, No Power Lines

, Lean Power, Solar and Wind Distributed Energy in NWA and the Ozarks, No Transmission Lines, No Power Lines

, Lean Power, Solar and Wind Distributed Energy in NWA and the Ozarks, No Transmission Lines, No Power Lines

Lean Power, Solar and Wind Distributed Energy in NWA and the Ozarks, No Transmission Lines, No Power Lines, Lean Power, Solar and Wind Distributed Energy in NWA and the Ozarks, No Transmission Lines, No Power Lines

, Lean Power, Solar and Wind Distributed Energy in NWA and the Ozarks, No Transmission Lines, No Power Lines

, Lean Power, Solar and Wind Distributed Energy in NWA and the Ozarks, No Transmission Lines, No Power Lines